Cornwall Steel Buildings

Steel framed garages and workshops

A portal frame at the house rather than on the farm — a garage, a workshop, somewhere to keep the project car. Tell us roughly what you need and you get engineered drawings and a price. Before any of that, there is one number that decides whether you need planning permission at all, and it is on this page.

Common span
6–9 m
Six takes two cars. Add a bench down one side and you want eight.
Eaves limit
2.5 metres
The permitted development cap. Above it, a full planning application.
Typical slab
150 mm
With mesh. A car is nothing next to a loaded trailer.
Building Regs
30 square metres
Detached, single storey, nobody sleeping in it — exempt below this.
Cold rolled steel garage in dark green cladding with a roller door and side window

What you are actually buying

The same portal frame as a farm building, in a garden, playing by domestic rules. Structurally it is the simplest thing on this site — a modest clear span, the lightest floor here, and a door sized around what gets parked in it. What makes it complicated is planning. A house carries permitted development rights of its own, they are tighter than the agricultural ones, and a steel frame meets the height limit sooner than a timber garage does. Settle that first and the rest is straightforward.

Span is the door, and then the room beside it

Two cars side by side wants about 6 metres clear. Put a bench and racking down one wall and you are at 7 or 8 before you have parked anything. Work outwards from what goes in and what you do next to it — a garage you cannot open a car door inside is a store with a big door.

Length is short, and costs behave differently

Domestic buildings rarely run to the 6 metre bay centres a farm building uses. One or two bays is normal. The cost per square metre falls more slowly than it does on a shed, because delivery, erection and the base are spread over far less floor — which is why a slightly bigger building is often better value than the one you first thought of.

Height decides which planning route you are on

Eaves at 2.5 metres keeps you inside permitted development and gives a door opening of roughly 2.1 to 2.3 metres once the frame and header are allowed for. Cars, a workshop and storage fit that. A motorhome, a horsebox, a tractor or a car lift does not, and wanting one turns the project into a full planning application. Decide this before anything else is drawn.

What you get asked to decide

  • Up-and-over, roller shutter or sliding doors, and whether a personnel door goes in the side
  • Insulated composite sheeting if it is going to be worked in through a Cornish winter
  • Box profile or fibre cement, and a cladding colour that will not give a planning officer a reason
  • Roof lights, and where the power and lighting runs go before the sheeting is on
  • Supplied for your own team to erect, or supplied and erected

There is one more choice underneath all of those: whether the frame is cold rolled or hot rolled. It changes the price, the lead time, whether you can put it up yourself, and what goes in the ground.

How it goes from here

Five steps, in this order. The fourth is the one nobody prices for you up front, which is why there is a calculator further down this page. The full steel building groundworks calculator for Cornwall and Devon explains every figure it gives you.

  1. Step 1

    Tell us roughly what you need

    Span, length and what it is for. Approximate is fine — nobody expects you to have decided, and it means the first reply can be useful rather than a list of questions.

  2. Step 2

    Drawings and a price for the frame

    The manufacturer prepares engineered drawings and quotes the building. That includes the pad foundation sizes, which no calculator can work out for you.

  3. Step 3

    Settle the planning position

    Domestic outbuildings run on Class E of Part 1, not the agricultural route — check the limits further down this page, the eaves height in particular. Fit inside them and there is nothing to apply for. Miss one and it is a full planning application, which is worth knowing before steel is ordered.

  4. Step 4

    Get the base in

    Site strip, level, stone and slab, ready and cured before the erectors arrive. This is the part you can price on this page today.

  5. Step 5

    Delivery and erection

    Delivered for your own team to put up, or supplied and erected. Both are normal; the difference is worth asking about at quote stage, not later.

Get a price for my garage or workshop

Rough dimensions are enough to start. You get a reply the same day.

The 2.5 metre problem

Permitted development caps the eaves of a domestic outbuilding at 2.5 metres. There is no exception to it — not for roof shape, not for where the building sits, not for the size of the plot. It is the first thing to measure a project against and almost nobody arrives knowing it exists.

Take the frame depth and the door header out of 2.5 metres and the opening comes out at somewhere around 2.1 to 2.3 metres. A car goes under that comfortably. So does a van, most of the time, and so does anything you would do on a bench. A motorhome at three metres does not. Neither does a horsebox, a tractor, or a car on a four-post lift with the room above it to work.

That is the whole decision, and it is worth making it honestly at the start. If what you want fits under the limit, the project is straightforward and there is nothing to apply for. If it does not, the building needs full planning permission — which is not a disaster and is granted all the time, but it is months and a fee rather than a decision you make on a Saturday. The mistake is discovering it after the frame is on order.

The lightest floor on this site

Every other building on this site is specified around farm traffic — a loaded grain trailer turning on the spot, a telehandler with a full bucket, the same few square metres taking punishment every day for thirty years. A domestic garage is not that. A family car is somewhere around a tonne and a half spread across four tyres, and the slab barely notices.

So 150mm with mesh is the honest starting point here rather than the 200mm a machinery store wants. It is one of the few places on this site where the answer is less concrete than you might have been told, and it is worth having the number before someone quotes you for a farm specification on a domestic building.

6.5 m³

A 6 × 6 m double garage at 150 mm with a 100 mm oversail — one ready-mix delivery, plus about 12.1 tonnes of Type 1 under it.

Two things change that answer. A four-post lift or a ramp puts the whole vehicle through four small feet, which is a point load rather than a spread one and wants designing properly. And if a horsebox, a motorhome or a tractor is ever going to stand in there, spec it as an agricultural floor at 200mm — by which point you are back at the eaves height question anyway, because none of those three fit under the limit.

Building Regulations, and why steel helps

Planning permission and Building Regulations are two separate questions, and people routinely answer one thinking they have answered both. A building can be permitted development and still need Building Regulations approval, or need planning permission and be exempt from the regulations entirely.

On the regulations side the news is good, and steel is the reason. A detached single-storey building under 30 square metres with no sleeping accommodation is exempt, provided it is either a metre clear of the boundary or built substantially of non-combustible material. A steel frame with steel cladding satisfies the second limb, so the boundary distance stops being the deciding factor — which is not true of the timber garage next door.

Two things end the exemption whatever it is made of. Sleeping accommodation of any kind, and floor area: 30 square metres is 5 by 6 metres, so a proper double garage is already past it. Being past it is not a problem, it is a process — but it is a process worth knowing about in advance.

Whether the regulations apply to a particular building is a question for your council's building control team, and worth a phone call before anything is ordered.

Where you stand on planning

A garage at the house is not agricultural development, so nothing on the rest of this site applies to it. The hectare thresholds, prior approval, the 28 day clock — all of that is Part 6, and a domestic outbuilding lives under Part 1 Class E instead. Different tests, different numbers, and no application route to fall back on if you miss one.

A building in a garden is not agricultural development, whatever the frame is made of. It sits under Part 1 of the General Permitted Development Order rather than Part 6, and the two have almost nothing in common beyond the instrument they live in.

The first difference is procedural, and it is the one worth understanding before any of the numbers. Part 6 has a prior approval route: you apply, the authority has 28 days, and there is a fee. Class E has nothing of the sort. Either the building meets every limit below, in which case it is permitted and no application is needed at all, or it fails one of them and needs full planning permission. There is no middle step to fall back on.

What Class E permits is a building within the curtilage of a house, required for a purpose incidental to the enjoyment of that house. Incidental is doing real work in that sentence. Storing the car, a workshop for your own use, garden machinery, a home gym — those are incidental. Running a business from it is not, and neither is anything that amounts to separate living accommodation. The test is what the building is genuinely required for, not what it is called on a drawing.

The limits. It must be single storey. No part of it may sit forward of a wall forming the principal elevation of the original house. Buildings, enclosures and containers in the curtilage, taken together and leaving the original house out of it, may cover no more than 50% of the curtilage. It cannot include a verandah, a balcony or a raised platform, and it cannot be within the curtilage of a listed building.

Height is where a steel frame runs aground. The eaves cannot exceed 2.5 metres, and that applies everywhere, with no exception for site or roof shape. Overall height can reach 4 metres with a dual-pitched roof or 3 metres with any other roof — but only if no part of the building is within 2 metres of the boundary of the curtilage. Inside that 2 metres, the whole building is capped at 2.5 metres.

Height is measured from the ground immediately next to the building, and where that ground is not level it is measured from the highest part of it. On a sloping plot that works against you rather than for you: the cut end of the platform sets the measurement, so the fall across the site quietly eats the headroom you thought you had. It is the one place on this site where the groundworks decision and the planning decision are the same decision.

Protected land changes the answer. In an Area of Outstanding Natural Beauty — branded a National Landscape since 2023, though the legislation still says AONB — or a National Park, World Heritage Site or the Broads, buildings more than 20 metres from any wall of the house are limited to 10 square metres of ground area in total. That is a garden shed. It rules out putting a steel building at the bottom of the paddock and keeping it permitted. On article 2(3) land, which takes in conservation areas as well, nothing may go on the land between a side elevation of the house and the boundary.

Two exclusions that remove the right entirely. Class E does not apply where permission to use the building as a house came only from one of the change of use classes in Part 3 — Class Q agricultural conversions among them — or where the house was built under Part 20. A converted barn has no Class E rights at all, so an outbuilding there is a planning application whatever its size. Worth establishing how the house became a house before drawing anything.

A summary, not planning advice, and England only. The legislation is Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015, as amended, with height measured as set out in article 2(2). Figures checked against legislation.gov.uk in September 2026. An article 4 direction or a condition on an earlier permission can remove these rights on a particular property, so confirm your own position with the authority that covers your site.

Work out the base for your garage

Already set to a domestic specification at 150mm. Put it up to 200mm in the slab thickness box if a horsebox, a motorhome or a tractor is going to stand on it.

Building

A car and a bench, not a tractor — the lightest working floor here.

m
m

Slab

Set by the building type above. Change it if you know different.

mm

Each side. Leave at 0 if it finishes flush.

mm

Site

mm

High corner to low corner.

Balanced keeps the dug material on the plot and moves the least.

mm

Dig a trial hole and measure it. This shifts more muck than the slope does.

Concrete to order for the slab
6.5m³waste allowed, rounded to the half metre
Garage / domestic workshop · slab 38.4 m² at 150 mm · working platform 84.6 m²
Ready-mix plant
Slab concrete
Net 5.8 m³ before waste
6.5m³
Quarry
Type 1 sub-base
Spread 188 mm loose to finish at 150 mm compacted
12.1t
Builders merchant
Mesh sheets
2.4 × 4.8 m sheets, 300 mm laps allowed
5sheets
Damp proof membrane
Laps and upstand included
43m²
Edge detail
Perimeter, for edge insulation or expansion joint
24.8m
Earthworks
Topsoil to strip
26.4 m³ once dug and loose
21.2m³
Cut
4.2m³
Fill
4.2m³

What this does not work out: the pad foundations

The concrete pads the stanchions sit on are sized by a structural engineer, not by a formula. They change with the span, the eaves height, the wind loading on your particular site and what the ground will bear. Anyone quoting you a pad size without a design has guessed it.

Want this priced properly?

Send us the job and we'll get you engineered drawings and a quote for the frame — with the pad sizes this tool can't work out. The figures above go with your enquiry, so you don't have to type them again.

Every enquiry gets a reply the same day, and your figures go with it. The building itself is designed and priced by South West Steel Buildings, our building partner, so your details go to them too, and they will be in touch. How we handle your details.

Common questions

Do I need planning permission for a steel framed garage or workshop at home?
Sometimes not, but the limits are tighter than most people expect and a steel frame runs into one of them quickly. Class E of Part 1 of the GPDO permits an outbuilding within the curtilage of a house provided it is required for a purpose incidental to the enjoyment of the house, is single storey, sits behind the principal elevation, covers no more than half the curtilage, and — the one that catches steel buildings — has eaves no higher than 2.5 metres. Overall height is capped at 4 metres for a dual-pitched roof, 3 metres for anything else, and 2.5 metres if any part of the building is within 2 metres of a boundary. There is no prior approval route under Class E: either it meets every limit or it needs full planning permission.
How tall can a permitted development outbuilding be?
The eaves cannot exceed 2.5 metres, and that limit applies wherever the building sits. Overall height can reach 4 metres with a dual-pitched roof, or 3 metres with any other roof, provided no part of the building is within 2 metres of the boundary of the curtilage — inside 2 metres of a boundary the whole building is capped at 2.5 metres. Height is measured from the ground immediately next to the building, and where the ground is not level it is measured from the highest part, so a sloping site gives you less usable height than a flat one rather than more. A 2.5 metre eaves height leaves a door opening of roughly 2.1 to 2.3 metres once the frame and the header are allowed for: enough for cars, a workshop and general storage, and not enough for a motorhome, a horsebox or a tractor.
How thick should the slab be for a steel framed garage?
A 150mm slab with mesh is the sensible starting point for a domestic garage or workshop, and it is the lightest specification on this site for a good reason: a car spreads a tonne and a half over four tyres, which is nothing next to the loaded trailer a farm slab is designed for. Two things push it up. A car lift or a four-post ramp concentrates the whole vehicle through four small feet, which is a point load and wants designing rather than guessing. So does anything bolted down that gets worked on — a press, a pillar drill, an engine stand. If a horsebox, a motorhome or a tractor is going to stand on it, spec it as an agricultural floor at 200mm instead.
How much concrete does a double garage base take?
A 6 by 6 metre double garage with a 150mm slab and a 100mm oversail comes to roughly 6.5 cubic metres of concrete once a waste allowance is added, plus around 12.1 tonnes of Type 1 for a 150mm compacted sub-base. That is a single ready-mix delivery and a couple of loads of stone. Change the dimensions in the calculator on this page for your own building, and note that the working platform is bigger than the slab — the diggers need somewhere to stand.
Can I run a business from a steel building in my garden?
Not under permitted development. Class E permits a building required for a purpose incidental to the enjoyment of the house — storing the car, a workshop for your own use, a gym, garden machinery. Running a business from it is a different use, and it is the point at which a certificate of lawfulness stops being available and a planning application starts being needed. The building might be identical either way; what changes is what happens inside it. If the intention is commercial, say so early and go the proper route, because retrofitting permission after a neighbour complains is a far worse position to be in.
Can I put an outbuilding up at a converted barn?
Not under permitted development. Class E does not apply where permission to use the building as a house was granted only by virtue of one of the change of use classes in Part 3 — which includes Class Q, the agricultural to residential conversion. A converted barn has no Class E rights for outbuildings at all, so a garage or workshop there is a full planning application regardless of its size or height. The same exclusion applies to houses created under Part 20. It is worth establishing how the house came to be a house before assuming anything about what can go in the garden.
Is it different in a National Landscape or a conservation area?
Yes, and this is where the domestic rules diverge sharply from the agricultural ones. In an Area of Outstanding Natural Beauty — the designation now branded as a National Landscape, though the legislation still uses the older term — or a National Park, World Heritage Site or the Broads, buildings sitting more than 20 metres from any wall of the house are limited to 10 square metres of ground area in total. That is a shed, not a garage, so a steel building at the far end of a paddock is a planning application. On article 2(3) land, which also takes in conservation areas, nothing may be built on the land between a side elevation of the house and the boundary of the curtilage. Cornwall and Devon carry a lot of this designation between the National Landscape, Dartmoor and Exmoor, so it is worth checking the position on your own plot before drawing anything.
Does a domestic garage or workshop need Building Regulations approval?
Often not. Class 6 of Schedule 2 to the Building Regulations 2010 exempts a detached single-storey building with a floor area of no more than 30 square metres that contains no sleeping accommodation, provided it is either at least one metre from the boundary of its curtilage or constructed substantially of non-combustible material. A steel frame with steel cladding meets the second limb, which means the boundary distance stops being the deciding factor. Two things end the exemption whatever the building is made of: sleeping accommodation of any kind, and a floor area over 30 square metres. A double garage at roughly 6 by 6 metres is already past it. Confirm your own position with your council’s building control team.

Garages and workshops we can price

Triple steel garage in green cladding with three roller doors
Three bay steel garage with white roller doors and green cladding
Olive green steel garage with a single roller door
Large dark green steel garage with an open front
Tall pale green steel garage with a dark roller door
Tall green clad farm building with a large open door

Get a price for your garage or workshop

Rough span and length is enough to start with, and say what has to fit through the door — it is the dimension that decides your planning route as well as your frame. You get engineered drawings and a price, including the pad foundation sizes.